Hybrid Solar + BESS · Shopping Centre · Mondlo, KwaZulu-Natal

Emondlo Retail Mall

The Emondlo Retail Mall is a major 832.5 kWp hybrid solar + BESS installation in Mondlo, KwaZulu-Natal.

Emondlo Retail Mall hybrid solar and battery storage system
Emondlo mall solar array closeup aerial
Emondlo mall battery racks in container

The project

It pairs 1,500 Jinko Solar 555W panels and 20 Sunsynk 50kW hybrid inverters with 1,617 kWh of battery storage. In the 12 months to October 2026 the plant produced 965,362 kWh, measured by our monthly O&M reports. The batteries keep the mall's tenants trading through grid outages, protecting anchor stores and cold-chain stock.

Energy to date

2.51 million kWh generated since March 2024.

Generated, Mar 2024 to Oct 2026
2,518,066 kWh
Monthly reports on record
32
Highest month, October 2024
108,335 kWh
Monthly output, kWh
  1. March 2024: 54,649 kWh.
  2. April 2024: 80,797 kWh.
  3. May 2024: 78,198 kWh.
  4. June 2024: 61,737 kWh.
  5. July 2024: 70,929 kWh.
  6. August 2024: 78,128 kWh.
  7. September 2024: 77,719 kWh.
  8. October 2024: 108,335 kWh.
  9. November 2024: 105,073 kWh.
  10. December 2024: 105,527 kWh.
  11. January 2025: 99,310 kWh.
  12. February 2025: 62,223 kWh.
  13. March 2025: 84,765 kWh.
  14. April 2025: 63,045 kWh.
  15. May 2025: 72,733 kWh.
  16. June 2025: 53,569 kWh.
  17. July 2025: 65,088 kWh.
  18. August 2025: 70,833 kWh.
  19. September 2025: 71,184 kWh.
  20. October 2025: 88,862 kWh.
  21. November 2025: 94,467 kWh.
  22. December 2025: 84,499 kWh.
  23. January 2026: 85,614 kWh.
  24. February 2026: 101,668 kWh.
  25. March 2026: 84,335 kWh.
  26. April 2026: 71,658 kWh.
  27. May 2026: 66,850 kWh.
  28. June 2026: 57,098 kWh.
  29. July 2026: 66,042 kWh.
  30. August 2026: 77,022 kWh.
  31. September 2026: 70,498 kWh.
  32. October 2026: 105,611 kWh.
Show the figures
By year
YearReportsGenerated (kWh)
202410821,092
202512910,578
202610786,396
Total322,518,066
By month
MonthGenerated (kWh)
March 202454,649
April 202480,797
May 202478,198
June 202461,737
July 202470,929
August 202478,128
September 202477,719
October 2024108,335
November 2024105,073
December 2024105,527
January 202599,310
February 202562,223
March 202584,765
April 202563,045
May 202572,733
June 202553,569
July 202565,088
August 202570,833
September 202571,184
October 202588,862
November 202594,467
December 202584,499
January 202685,614
February 2026101,668
March 202684,335
April 202671,658
May 202666,850
June 202657,098
July 202666,042
August 202677,022
September 202670,498
October 2026105,611

We monitor the plant and report to its owner monthly. Each bar is the output printed on that month’s report, as it happened: months when the grid was down or an inverter was out for repair are included, not smoothed over. March 2024 is a part month: the last section of the plant was completed on 26 March 2024.

Source: the plant’s monthly operations and maintenance reports, 32 on record, figures checked on 17 November 2026.

Technical Specifications

The plant in figures.

System Capacity
832.5 kWp
Panel Brand
Jinko Solar 555W
Inverters
20 × Sunsynk 50kW
Annual Production (measured)
965,362 kWh/year
Solar Panels
1,500 solar panels
Battery Storage
1,617.4 kWh
Location
Mondlo, KwaZulu-Natal
Client
Masingita Properties
Commissioned
6 March 2024

Included.

  • Generator Integration
  • Production Guarantee
  • 25-Year Maintenance Agreement
  • 24/7 Remote Monitoring
  • Preventive Maintenance
  • Performance Reporting

A system like Emondlo Retail Mall, designed for your site

Emondlo Retail Mall is a real 832.5 kWp hybrid solar + bess installation we delivered in Mondlo. We can structure something similar for your business — funded, capex or hybrid.

  • 18.2MW

    under O&M across 28 installations

  • 20MW+

    built since 2010

  • ECB licensed

    SAAEA member

  • Since 2010

    200MW+ REIPP heritage

Want a system like this?

Get a 832.5 kWp system like Emondlo Retail Mall

Tell us a bit about your business. We’ll come back within 24 hours with a tailored proposal — and yes, funded options are on the table.

Mobile or email — whichever you prefer for the callback.

  • Specialist callback within 24 hours (business days)
  • Free, no-obligation feasibility review
  • Funded / capex / hybrid — we’ll show you the right structure
  • We use your details only to handle your enquiry. Privacy policy

Prefer a quick call about a system like Emondlo Retail Mall? Call us.