Mines draw heavy power around the clock, often far from a strong grid. We design, build and maintain ground-mount solar and battery storage on mine sites. It starts with a free desktop proposal, not a site visit.

Aerial view of the 5 MW ground-mount solar plant at Stibium Mine, Limpopo

5,068 kWp

Solar at Stibium Mine, commissioned May 2025

8,814

Jinko 575 W modules at Stibium

10 MWh

Battery under construction at Stibium (Phase 2)

2.59 MWp

More solar under construction (Phase 2)

Why businesses choose SolarXgen

We finance, build and operate commercial solar and BESS — so you don't have to manage capex, contractors or risk.

At Stibium Mine in Limpopo we built the 5 MW solar plant, commissioned in May 2025. Phase 2, a 10 MWh battery and 2.59 MWp of extra solar, is under construction.

  • 18.2MW

    under O&M across 28 installations

  • 20MW+

    built since 2010

  • ECB licensed

    SAAEA member

  • Since 2010

    200MW+ REIPP heritage

Free site review

60-second mine solar review

Tell us about your site. We’ll come back within 24 hours with a tailored saving estimate.

Mobile or email — whichever you prefer for the callback.

  • Callback within 24 hours (business days)
  • Free, no-obligation feasibility review
  • We use your details only to handle your enquiry. Privacy policy

Why Solar for Mining

The business case.

Mines run around the clock. Pumping, ventilation, hoisting and processing draw heavy, steady loads, and many sites are remote, with generators standing by when grid supply is weak. That makes the cost and security of power a constant concern.

At Stibium Mine in Gravelotte, Limpopo, we designed and built a 5,068 kWp ground-mount solar plant: 8,814 Jinko 575 W modules and 14 Sungrow 350 kW inverters, designed to work alongside the mine's grid supply and generators. It was commissioned on 8 May 2025 and we maintain it.

Phase 2 at the same mine is under construction: a 10 MWh battery and 2.59 MWp of additional solar on the mine's 11 kV network. It is not yet commissioned.

The problem

The energy challenge.

Rising tariffs, load shedding and grid instability are hitting this sector hard. Here's what we see:

Round-the-clock loads from pumping, ventilation, hoisting and processing

Remote sites that lean on diesel generators when grid supply is weak or interrupted

Rising electricity tariffs and higher charges in peak hours

Growing pressure to report and reduce carbon emissions

Our solution

How SolarXgen solves it.

Ground-mount solar on mine land

Large ground-mount plants on available land near the load, like the 5 MW plant we built at Stibium Mine.

Battery storage for peak hours

Store surplus solar and off-peak energy, then use it in Eskom's peak hours. Stibium Phase 2 is being built this way.

Designed around your generators

Solar designed to run alongside the mine's existing generators and grid supply, as at Stibium.

kWhSSEG

Connected to your own network

Plants tied into the mine's own medium-voltage network, such as the 11 kV connection for Stibium Phase 2.

Operations and maintenance

We maintain the plants we build, with remote monitoring on the inverter maker's platform.

R0.00SAVE

Own it or fund it

Buy the plant outright, or ask us about funded options so capital stays in the mine.

Under construction now

What we are building for Stibium Mining.

Aerial view of the 5 MW solar plant at Stibium Mine that Phase 2 adds toIn construction

The Phase 1 plant, June 2025. Phase 2 adds 2.59 MWp of solar and a 10 MWh battery at the same mine.

Mining · Gravelotte, Limpopo

Stibium Mine, Phase 2

A second phase at the mine where we built the 5 MW plant in 2025: more solar and a grid-scale battery on the mine's 11 kV network. The battery fills up when power is cheap and feeds the mine through Eskom's peak hours.

10 MWh

Battery storage, 5 MW

2.59 MWp

Additional solar

2 × 5 MWh

Sungrow PowerTitan 2.0 units

11 kV

Connection to the mine

How the battery runs

  1. 1Charges from surplus solar by day and from the grid in off-peak hours
  2. 2Discharges into the mine's own load in the morning and evening peaks
  3. 3About one full cycle a day, with no export to the grid

Under construction. Contracted July 2026; solar modules on site since October 2026.

See Phase 1, built and running
Four Sungrow battery cabinets on their concrete plinth at the Letaba pump stationIn construction

The four battery cabinets on their plinth at Letaba, 27 October 2026.

Mine water supply · Limpopo

Letaba Pump Station

Solar and battery storage for a water pump station owned by Stibium Mining. The battery stores surplus solar and off-peak energy and uses it when grid power costs most.

1,028 kWh

Battery storage, 500 kW

347 kWp

Ground-mount solar

4 × 257 kWh

Sungrow battery cabinets

560

LONGi 620 W modules

How the battery runs

  1. 1Charges from surplus solar and from the grid in off-peak hours
  2. 2Discharges into the pump station's load in peak periods
  3. 3Cuts peak demand on the supply, with no export to the grid

Under construction. Battery cabinets delivered and set on their plinth on 27 October 2026.