Rooftop SolarShopping Centre1,108.08 kWp

Masingita Mall (Phase 2)

Giyani, Limpopo Masingita Properties

The second tranche of SolarXgen's Masingita Mall installation in Giyani, Limpopo adds 1,108 kWp to the existing Phase 1 system. Using 2,052 JA Solar 540W panels and 9 GoodWe 100kW inverters, the system generates over 1.6 million kWh annually. Combined with the 616 kWp first phase, Masingita Mall now hosts over 1.7 MW of rooftop solar — the largest in the Masingita Properties portfolio. The expansion provides substantial energy savings for the regional shopping centre and demonstrates the scalability of SolarXgen's commercial solar solutions.

Masingita Mall Phase 2 rooftop solar installation

Technical Specifications

System Capacity

1,108.08 kWp

Panel Brand

JA Solar 540W

Inverters

9 × GoodWe 100kW

Annual Production

1,633,938 kWh/year

Yield (kWh/kWp)

1,474.6

Performance Ratio

77.20%

Solar Panels

2,052 solar panels

Guarantee

25 years

Location

Giyani, Limpopo

Commissioned

17 September 2021

Included

Generator Integration
Production Guarantee
25-Year Maintenance Agreement
24/7 Remote Monitoring
Preventive Maintenance
Performance Reporting

A system like Masingita Mall (Phase 2), designed for your site

Masingita Mall (Phase 2) is a real 1,108.08 kWp rooftop solar installation we delivered in Giyani. We can structure something similar for your business — funded, capex or hybrid.

  • 18.2MW

    under O&M across 28 sites

  • 20MW+

    built since 2010

  • B-BBEE Level 1

    ECB licensed, SAAEA member

  • R20M PI

    professional indemnity

  • Since 2010

    200MW+ REIPP heritage

Want a system like this?

Get a 1,108.08 kWp system like Masingita Mall (Phase 2)

Tell us a bit about your business. We’ll come back within 24 hours with a tailored proposal — and yes, funded options are on the table.

Mobile or email — whichever you prefer for the callback.

  • Specialist callback within 24 hours (business days)
  • Free, no-obligation feasibility review
  • Funded / capex / hybrid — we’ll show you the right structure

Prefer a quick call about a system like Masingita Mall (Phase 2)?